CTO - TELEGRAPH APPARATUS


This page has pictures of ancillary equipment use within the CTO.

Amplifier racks serving phonogram room - 1935

 

Automatic miscellaneous rack - 1934

 

Concentrator and relay test panel 3rd floor - 1932

 

Distribution rack equipment - 1936

 

London and Leeds switches - 1936

 

Observation rack - 1936

 

Apparatus racks - 1947

 

Telegraph equipment TG744 relay test panel - 1934

 

Telegraph equipment TG748 concentrator - 1934

 

Telegraph equipment TG750 relay test panel - 1934

 

Telegraph equipment TG803 observation and test set - 1934

 

Telegraph equipment TG835 test board - 1934

 

Telegraph equipment TG865 synchroscope panel - 1934

 

Telegraph equipment TG866 control board - 1934

 

Telegraph equipment TG867 fuse board - 1934

 

Telegraph equipment TG873 panel for LPS circuits - 1934

 

Telegraph equipment TG873 panel for LPS circuits - 1934

 

Telegraph equipment TG928 relay - 1934

 

Teleprinter private wire equipment run 25  - 1932

 

VF terminal ground floor - 1937

 

Double pneumatic puncher - 1915

 

Double pneumatic puncher - 1915

 

Double pneumatic puncher c126 - 1902

 

Chronopher control clock - 1924

 

Chronopher - At the UK Central Telegraph Office, London.
This was operated by the Greenwich time system via a 7 mile cable and this Chronopher
then transmitted the signal to Rugby via 94 miles of cable.
Picture dated 1928

 

Switch teleprinter  TG986 - 1936

 

 

 

 
BACK Home page CTO Main Page Search the Site Glossary of Telecom Terminology Quick Find All Telephone Systems

Last revised: August 20, 2023

FM2