UNDERGROUND CONSTRUCTION
| ||||||||
|
The main cables from an exchange are dry air pressurised, to prevent ingress of water, and as they were expensive cables, the less joints means literally no maintenance. It was found that if the cable leaked, the pressure would generally be enough stop any water entering the cable to far until the leak was repaired. There is usually an air pressure rack in the local exchange and this rack has a desiccators, air gauges and air adjusters on it. In reduction in air pressure would operate an alarm in the exchange. There is normally an air cylinder close by in case the desiccator goes faulty.
Cable Pressure rack
Engineer adjusting the alarm setting on a pressure gauge.
|
||||||||
Last revised: April 05, 2023FM2 | ||||||||