UNDERGROUND CONSTRUCTION
| ||||||||
|
Ducts and cable were laid in trenches. These ranged in depth depending on the situation and could involve hand digging, trenching machines and even moleploughs. Most of the large projects were undertaken by contractors with GPO supervision. Queen Victoria Street, London - 1901
Installing Octagonal ducts at Ludgate Hill, London - 1921
Trench excavator in action - 1941
Trench Excavator - 1941
Ditchwich M322 Excavator - 1961
PVC ducts in open formation in Birmingham - 1963
Installing Steel ducts at Battersea Rise, Railway Bridge, London - 1900
Lowering ducts at Maida Vale, London - 1900 |
||||||||